AG SCIENCE CENTERS & AGRIVOLTAICS
NREL - The 5 Cs of Agrivoltaic Success Factors in the United States: Lessons From the InSPIRE Research Study. Utility scale PV installations are expected to require a minimum of 4 million acres, and up to 11 million acres of land, by 2050 based on solar deployment scenarios (U.S. Department of Energy 2021).Agricultural lands coincide with areas favorable to solar energy deployment; the available s
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyō status | Obfuscated Data |
Taiyō last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | NREL - The 5 Cs of Agrivoltaic Success Factors in the United States: Lessons From the InSPIRE Research Study. Utility scale PV installations are expected to require a minimum of 4 million acres, and up to 11 million acres of land, by 2050 based on solar deployment scenarios (U.S. Department of Energy 2021).Agricultural lands coincide with areas favorable to solar energy deployment; the available solar insolation and stable soil conditions on agricultural lands reduce project risks (Adeh et al. 2019). Farmlands have many characteristics that make them desirable from a solar development perspective, including having existing connections to the electric grid, access roads, and relatively flat ground.These characteristics, combined with the growing economic challenges of traditional farming, have led to solar projects being developed on agricultural lands (Walston et al. 2021). Deployment of solar technologies in rural landscapes has led to community resistance to solar development, similar to the resistance to cellular tower development, wind energy development and oil and gas development (Wilke 2020; Petrova 2013; Thomas et al.2017; Moore et al. 2021) in some locations throughout the United States. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
